TILOS (Time and Location System) was developed to improve visualization of repetitive tasks when planning and managing major projects. The time-distance diagram supports all highway, rail, tunnel, pipeline and bridge projects.The key benefits of TILOS are the flow of visual data in terms of time and place on one plan.
CPM schedules and network diagrams are more analytical, but they fail to provide a visual connection between the project plan and the project itself. It can be used in different construction industries, like Highway -, Railway -, Pipeline -, and Tunnel construction, but also in Water Engineering or Transmission Line Building.
http://www.tilos.org/tilos-g?gclid=COr-3L-UwLoCFU5gpQodYjQACQ